Port Rigmar
Eigenaar:
Seadrill
Type:
Accommodation Jack-up unit
Periode:
Summer 2007
In July 2007, the “Ekofisk Accommodation” Jack-Up “Port Rigmar” docked in the mammoth drydock.

The main work consisted of the strengthening of one of the unit's legs, making her suitable to continue operating as the Ekofisk main accommodation unit. Specific for this job was the use of high yield strength steel ("Dilimax 690") and the position to actually execute the work: at approximately 100 metres above the dock floor. Simultaneously, the regulatory class special survey, bottom plate renewals and the installation of new and additional marine equipment like offshore cranes, water makers, and air conditioning units were carried out